Fleet Management

Yacht Administration, but a bit clever.

Lightship streamlines your workflow, leaving you more time for the important stuff. Everything you need in one clear interface, with just enough automation to make it easy without getting in the way.

Fleet Overview

Every vessel, one dashboard

Real-time visibility across your entire fleet. Safety incidents, audit schedules, crew status, equipment condition, and compliance, all surfaced in a single view. No more chasing spreadsheets or waiting for email updates.

Lightship fleet overview dashboard
Safety Checklists

Create, assign, and track inspections

Build checklists from templates or from scratch. Assign them across your fleet with due dates and frequency. Track progress in real time, flag deficiencies, and raise corrective actions, all from one screen.

Safety checklists with progress tracking
Incidents & Drills

Report, investigate, improve

Structured incident reports with root cause analysis, corrective actions, and witness statements. Safety drill records capture scenarios, participants, equipment used, lessons learned, and areas for improvement. Everything auditable and exportable.

Safety incident report with root cause analysis
Man overboard drill record
Risk Assessments

Identify, assess, mitigate

Operational risk assessments for every activity onboard: engine room operations, deck work, navigation, and more. Identify hazards, assign likelihood and consequence, define controls, and set review dates. All linked to your vessels and crew.

Risk assessments list with status indicators
Procedures

Emergency response at everyone's fingertips

Documented emergency procedures accessible to all crew. Step-by-step response protocols, safety precautions, and approval workflows. From man overboard to fire response, versioned, approved, and always available.

Man overboard emergency response procedure
Project Management

Refit and build projects, on track

Gantt-chart project planning built for marine projects. Break work into phases and tasks, assign dates, track dependencies, and monitor progress. Whether it's a mid-life refit or a new build commissioning, keep every stakeholder aligned.

Project management Gantt chart for yacht refit
Ship's Logbook

Official logs, digitally compliant

Malta and Red Ensign Group compliant ship's logbook. Record watch changes, port arrivals and departures, noon positions, and all statutory entries. Every entry timestamped with position, weather, and sea state. Export to PDF at any time.

Official ship's logbook with log entries
MARPOL Compliance

Oil and garbage record books

MARPOL Annex I and Annex V compliant record keeping. Log fuel receipts, bilge water discharges, oil transfers, and waste disposal with proper operation codes. All entries signed, auditable, and ready for port state inspection.

Oil record book with MARPOL entries
Garbage record book with waste categories
Desktop & Mobile

Works on every device

Full access on desktop, tablet, or phone. Crew can file reports dockside or mid-ocean, wherever they are, the platform is with them.

Lightship ISM dashboard on tablet
Lightship ISM safety drills on mobile
Get Started

Fancy a demo?

Send our team an email for a no-obligation walkthrough.

info@forelandmarine.com